# Production

> Plan production runs with the Schedule, Worksheet, and List views

# Production

The Production page plans manufacturing: which SKUs to produce, on which lines, at which locations, and when. It combines runs already underway, your committed run schedule, and the solver's suggested runs in one surface.

Navigate to **Production** under the Supply Chain group in the sidebar. The page header shows the plan freshness indicator ("Plan as of…").

## The production lens

Production carries its own two-axis lens strip instead of the shared four-position scenario strip:

* **Base** — the standing position the schedule is read against: **In progress** (real supply only) or **Committed** (in progress plus your accepted commitments).
* **Compare** — the recommendation world overlaid on the base: **With recs** (the solver's plan) or **No input limits** (the counterfactual where no production stage is constrained by its inputs).

**No input limits** is served from its own paired solve; when it isn't selectable, the position stays visible and states the specific reason (not enabled, never solved, no comparison produced, or unreadable). When it's active, a stamp shows when the counterfactual was solved. If you arrive from another planning page, a notice explains what carried over — other pages set Base only, and the comparison choice stays on Production.

## Tabs

| Tab           | Purpose                                                                          |
| ------------- | -------------------------------------------------------------------------------- |
| **Schedule**  | The run workbench — production by line, SKU, and period                          |
| **Worksheet** | The per-SKU inventory flow across the horizon                                    |
| **List**      | A flat, sortable list of every run row — in progress, committed, and recommended |

## Shared controls

One toolbar drives all three tabs:

* **Search** — by SKU name or code, location, or line.
* **Filter chips** — add filters via the **Add filter** popover; **Clear all** resets them.
* **Date range picker** — with Weekly/Monthly granularity; shown on Schedule and Worksheet (the flat List has no time axis).
* **Saved views** — round-trip filters, grouping, sort, and granularity.
* **Create run** — on the Schedule tab, for users with planning write access. Opens the create drawer, prefilled with the cell's node, line, SKU, and period when opened from a schedule cell.
* **Table settings** — grouping, sort, Qty/\$ display, an **In-progress** toggle ("Open orders / runs already underway"), a **Recommendations** toggle ("The solver's suggested runs"), and **Export CSV** (`production-runs.csv`). On the Worksheet, a **Rec timing** control buckets recommendations by **Landing date** (arrival bucket) or **Order date** (order bucket).

## The run drawer

Clicking a run from the Schedule or List opens the run drawer. A schedule cell can bundle several runs (committed and suggested); the drawer shows them all in a "runs in this period" table with:

* Per-run detail and daily breakdown.
* An inline **edit** affordance on committed runs — the route to the editable run form from multi-run cells.
* Raw-material coverage tinting on committed rows.
* **Accept**, **Dismiss** ("Removed from queue for 14 days."), and **Restore** on suggested runs — the standard [recommendation lifecycle](/supply-planning/recommendations).

<Info>
  Under the **No input limits** comparison, the suggested runs shown are the counterfactual plan's own program, served as of its solve. They are read-only — accept and dismiss are suppressed — while committed rows stay editable.
</Info>

### Raw-material coverage

The drawer's raw-material coverage section shows the projected inventory status of every SKU in the run's [BOM](/principal-catalog/boms) at the run's period, with required quantities. Short components get an inbound-supply sub-line — for example "1,200 arriving by Aug 12 · 300 in transit", or "Nothing inbound" — so a shortfall covered by incoming POs is distinguished from a real one. Coverage is identical for committed and suggested runs; it's read from the solver projections either way.

### Why-no-production attribution

A demand-bearing cell the plan schedules **no** production for can be opened too: the attribution drawer explains why — the run is material-bound (an input is short) or capacity-bound (the line is saturated). From there, **Create run anyway** opens the create drawer prefilled with the cell's node, line, SKU, and period, so you can overrule the solver deliberately.

## Creating and editing runs

* **Create run** (toolbar) or **Create run anyway** (attribution drawer) opens the production create drawer. Creating requires planning write permission; a dirty form guards against accidental close.
* Committed runs are edited through the shared movement drawer, and **Order** converts a committed run into a real production transaction at the run's node — reserving its BOM components — via a confirmation dialog. See [Execution plan](/supply-planning/execution-plan).

## Best practices

<AccordionGroup>
  <Accordion title="Compare against No input limits to find binding materials">
    If the counterfactual produces more than the solver's plan for a SKU, an input is the constraint. The run drawer's raw-material coverage and the attribution drawer tell you which one; [MRP](/supply-planning/mrp) shows how to fill it.
  </Accordion>

  <Accordion title="Check raw-material coverage before accepting a run">
    A suggested run with short components and nothing inbound will slip. Accept the upstream buy (or transfer) alongside it, or use MRP's gap fills.
  </Accordion>

  <Accordion title="Use Rec timing to match your planning question">
    On the Worksheet, **Landing date** answers "when does this supply arrive?" while **Order date** answers "when must I act?". Switch depending on whether you're reviewing coverage or building a work queue.
  </Accordion>

  <Accordion title="Author runs from the cell, not from scratch">
    Opening create from a schedule cell (or the attribution drawer) prefills node, line, SKU, and period — less re-keying and fewer wrong-line mistakes than the blank header form.
  </Accordion>
</AccordionGroup>

## Troubleshooting

| Issue                                 | Cause                                                                                            | Solution                                                                                 |
| ------------------------------------- | ------------------------------------------------------------------------------------------------ | ---------------------------------------------------------------------------------------- |
| No scenario strip on this page        | Production uses its own two-axis lens instead                                                    | Use the **Base** and **Compare** controls at the top of the page                         |
| **No input limits** disabled          | The reason is stated below the control                                                           | Enable the feature, run a solve, or retry — as the message directs                       |
| Can't accept a suggested run          | The **No input limits** comparison is active (read-only), or the recommendation no longer exists | Switch Compare to **With recs**; if it persists, the rec was superseded by a newer solve |
| **Create run** button missing         | You lack planning write permission, or you're not on the Schedule tab                            | Switch to Schedule; ask an admin about [permissions](/roles-permissions)                 |
| Date range picker missing on the List | The List is a flat view with no time axis                                                        | Use Schedule or Worksheet for time-bucketed views                                        |

## Next Steps

<CardGroup cols={2}>
  <Card title="MRP" icon="boxes-stacked" href="/supply-planning/mrp">
    Material requirements for your committed runs
  </Card>

  <Card title="BOMs" icon="diagram-project" href="/principal-catalog/boms">
    The bills of materials behind raw-material coverage
  </Card>

  <Card title="Recommendations" icon="list-check" href="/supply-planning/recommendations">
    Accept, dismiss, and restore suggested runs
  </Card>

  <Card title="Execution plan" icon="list-check" href="/supply-planning/execution-plan">
    Edit and order committed production runs
  </Card>
</CardGroup>