Production
The Production page plans manufacturing: which SKUs to produce, on which lines, at which locations, and when. It combines runs already underway, your committed run schedule, and the solver’s suggested runs in one surface. Navigate to Production under the Supply Chain group in the sidebar. The page header shows the plan freshness indicator (“Plan as of…”).The production lens
Production carries its own two-axis lens strip instead of the shared four-position scenario strip:- Base — the standing position the schedule is read against: In progress (real supply only) or Committed (in progress plus your accepted commitments).
- Compare — the recommendation world overlaid on the base: With recs (the solver’s plan) or No input limits (the counterfactual where no production stage is constrained by its inputs).
Tabs
Shared controls
One toolbar drives all three tabs:- Search — by SKU name or code, location, or line.
- Filter chips — add filters via the Add filter popover; Clear all resets them.
- Date range picker — with Weekly/Monthly granularity; shown on Schedule and Worksheet (the flat List has no time axis).
- Saved views — round-trip filters, grouping, sort, and granularity.
- Create run — on the Schedule tab, for users with planning write access. Opens the create drawer, prefilled with the cell’s node, line, SKU, and period when opened from a schedule cell.
- Table settings — grouping, sort, Qty/$ display, an In-progress toggle (“Open orders / runs already underway”), a Recommendations toggle (“The solver’s suggested runs”), and Export CSV (
production-runs.csv). On the Worksheet, a Rec timing control buckets recommendations by Landing date (arrival bucket) or Order date (order bucket).
The run drawer
Clicking a run from the Schedule or List opens the run drawer. A schedule cell can bundle several runs (committed and suggested); the drawer shows them all in a “runs in this period” table with:- Per-run detail and daily breakdown.
- An inline edit affordance on committed runs — the route to the editable run form from multi-run cells.
- Raw-material coverage tinting on committed rows.
- Accept, Dismiss (“Removed from queue for 14 days.”), and Restore on suggested runs — the standard recommendation lifecycle.
Under the No input limits comparison, the suggested runs shown are the counterfactual plan’s own program, served as of its solve. They are read-only — accept and dismiss are suppressed — while committed rows stay editable.
Raw-material coverage
The drawer’s raw-material coverage section shows the projected inventory status of every SKU in the run’s BOM at the run’s period, with required quantities. Short components get an inbound-supply sub-line — for example “1,200 arriving by Aug 12 · 300 in transit”, or “Nothing inbound” — so a shortfall covered by incoming POs is distinguished from a real one. Coverage is identical for committed and suggested runs; it’s read from the solver projections either way.Why-no-production attribution
A demand-bearing cell the plan schedules no production for can be opened too: the attribution drawer explains why — the run is material-bound (an input is short) or capacity-bound (the line is saturated). From there, Create run anyway opens the create drawer prefilled with the cell’s node, line, SKU, and period, so you can overrule the solver deliberately.Creating and editing runs
- Create run (toolbar) or Create run anyway (attribution drawer) opens the production create drawer. Creating requires planning write permission; a dirty form guards against accidental close.
- Committed runs are edited through the shared movement drawer, and Order converts a committed run into a real production transaction at the run’s node — reserving its BOM components — via a confirmation dialog. See Execution plan.
Best practices
Compare against No input limits to find binding materials
Compare against No input limits to find binding materials
If the counterfactual produces more than the solver’s plan for a SKU, an input is the constraint. The run drawer’s raw-material coverage and the attribution drawer tell you which one; MRP shows how to fill it.
Check raw-material coverage before accepting a run
Check raw-material coverage before accepting a run
A suggested run with short components and nothing inbound will slip. Accept the upstream buy (or transfer) alongside it, or use MRP’s gap fills.
Use Rec timing to match your planning question
Use Rec timing to match your planning question
On the Worksheet, Landing date answers “when does this supply arrive?” while Order date answers “when must I act?”. Switch depending on whether you’re reviewing coverage or building a work queue.
Troubleshooting
Next Steps
MRP
Material requirements for your committed runs
BOMs
The bills of materials behind raw-material coverage
Recommendations
Accept, dismiss, and restore suggested runs
Execution plan
Edit and order committed production runs